01
Pool structure
Excavation, steel, gunite, plumbing and backfill.
Excavation and dirt removal
Layout, elevation and excavation of the 13' x 27' pool with a 6' x 13' sunshelf, 3' to 4'11" deep, with all dirt hauled off site.
See details
Pool Excavation & Dirt Removal · 80 Linear Feet × $50
- Pool shell excavation and haul-off/removal of excavated dirt from the job site. Priced per linear foot.
Rebar and forms
Forms and engineered steel grid across floor, walls, steps and beam, bonded per NEC 680 and inspected before gunite.
See details
Rebar & Forms · 80 Linear Feet × $51.88
- Steel reinforcement and forming for the pool/spa shell, installed to the structural engineer's plans and Florida Building Code.
- Layout and setting of forms around the pool perimeter to establish the shell shape and beam
- Supply and installation of steel rebar per engineered spacing and size, tied in a grid across the floor, walls, steps, benches and beam
- Rebar supports/chairs to hold proper clearance for the gunite
- Bonding of the steel per NEC 680 requirements (bonding inspection coordinated per permit)
- Steel inspection coordinated before gunite
Gunite shell
The structural concrete shell, sprayed to the engineer's plans and the Florida Building Code.
See details
Gunite · 80 Linear Feet × $185
- Gunite (shotcrete) application for the pool shell, built to the structural engineer's plans and Florida Building Code.
Perimeter piping and plumbing
Main drain, skimmer, return and suction lines to the equipment pad, pressure tested twice and inspected.
See details
Perimeter Piping & Rough Plumbing · 1 Each × $4,000
- Stage 1 (before gunite): main drain lines installed and pressure tested.
- Stage 2 (after gunite, form removal and first backfill): trenching to the equipment pad, PVC piping for skimmers, returns and suction lines, rough-in for the pool features on the plans, second pressure test.
- Inspection of the perimeter piping, underground electrical lines and pressure test coordinated per permit before the second backfill.
- Final equipment connections at the pad are covered by the equipment pack.
Backfill and grading
Two-stage backfill, compacted and graded to deck level with slope away from the pool and the house.
See details
Backfill & Grading To Deck Level · 1 Each × $2,600
- Stage 1: first backfill around the shell after gunite and form removal, to prepare for the perimeter piping.
- Stage 2 (after the piping and electrical inspection): fill placed in compacted lifts, graded to the deck sub-grade with slope away from the pool and house, final leveling and cleanup.
- Import of additional fill, if required, is not included.